| 1. | Specification for construction and acceptance of oil pump set 输油泵组施工及验收规范 |
| 2. | Analysis and countermeasure on starting unusually of the tububar pump set 泵站贯流式机组起动异常分析及对策 |
| 3. | The experimental method about pump setting characteristics with long discharge pipe 带长出水管模型泵装置特性试验方法 |
| 4. | Controlling the installing quality of overhang - well - vertical - draw out core pumping set 大型悬吊井筒抽芯式泵机组安装质量控制 |
| 5. | The remote online monitor and diagnosis system of water pump set based on internet and terminal server 终端服务的水泵机组远程在线监诊系统 |
| 6. | Design of vibration isolation device with floating raft for pump sets in ship and research on its dynamic properties 船用水泵机组的隔振设计与动态特性分析 |
| 7. | Research on the properties of vibration isolation system with floating raft for ship pump set with spatial piping 带空间管系的船舶水泵机组隔振浮筏性能研究 |
| 8. | Determination of pump setting depth for commingled production wells in the reservoir with two heterogeneous layer system 葡西油田两套层系合采井的合理泵挂深度 |
| 9. | Numerical simulation of turbulent flow inside inlet duct and experiment on characteristic performances in shaft tubular model pump set 泵站竖井进水流道数值模拟与装置特性试验 |
| 10. | The first stage of extensions started in 1974 and was completed on 26 november 1978 . the main works were based on the original system with the addition of 7 pump sets and the additional small reservoirs . the cost for the engineering works was 14 , 830 , 000 rmb 东深工程曾扩建三次,第一期扩建工程于1974年开始动工, 1978年11月26日完工,主要是按原规划加建7台抽水机及增建中小型水库,工程费用达人民币1 , 483万元。 |